Commercial project · Holon, Israel

Wolfson Hospital

Power-to-heat thermal energy storage for hospital steam and hot water.

12 MWhProject metric
2 MWProject metric
5 ton/hourProject metric
Wolfson Hospital

Project Overview

The Wolfson Hospital power-to-heat project is designed to replace fuel-oil boilers at Wolfson Medical Center. The system will charge using lower-cost grid electricity and provide continuous saturated steam and hot water for hospital operations. With 2 MW of electrical charging capacity and output of up to five tons of steam per hour, the project is expected to significantly reduce local emissions and fossil-fuel consumption.

Frequently asked questions

Your questions.
Answered.

The public design scope for hospital steam, hot water and replacement of fuel-oil boilers.

Talk to our team

Where is the Wolfson Hospital thermal storage project located?

The project is at Wolfson Medical Center in Holon, Israel. The public page describes a power-to-heat application serving hospital energy needs.

Which existing heat source is the Wolfson project designed to replace?

The project is designed to replace fuel-oil boilers. Its stated objectives include reducing local emissions and fossil-fuel consumption while supplying heat for hospital operations.

How is the Wolfson power-to-heat system intended to charge?

The overview states that the system will charge using lower-cost grid electricity. The electricity is used in the power-to-heat storage arrangement described for the hospital.

What heat services are planned for Wolfson Medical Center?

The system is intended to provide continuous saturated steam and hot water for hospital operations. The page describes these services as the project's design scope rather than publishing a current operating schedule.

What charging and steam capacities are stated for the Wolfson design?

The public overview states 2 MW of electrical charging capacity and output of up to five tons of steam per hour. The surrounding description uses future-tense design language, so these figures should not be treated as evidence of measured current output or commissioning.